A 200+ phone and 200+ ethernet node installation into two new buildings contsructed for Infinite Energy. The setup features a fiber optic backbone and has a 15 Mbps ouside incoming bandwidth.
A completed back side host-end patch panel. |
|
A working setup, days before completion. This host-end late night move was completed over the weekend, so the network was up and ready Monday morning. |
|
|
|
|
![]() A demarcation point for incoming fiber optic and other high speed data lines. |
Patch panel with two T1 circuits for temporary communication until the final network was completed. |
|
|
|
|
|
The crew performing a host-end communications swing (location move) at 1 AM. The move included upgrades such as increased network capacity. |
||
|
|
![]() |
Exactech
Communications array and building wiring for a 200+ node system.
Almost in the final stage of the host-end construction. |
|
![]() Back view of the host-end with minimal cable management. |
|
![]() |
|
||
![]() A rack patch panel with cable distribution, phone and ethernet ready. |
Beginning a host-end phase with cable management. |
||

A completed back side host-end patch panel.
A working setup, days before completion. This host-end late night move was completed over the weekend, so the network was up and ready Monday morning.
Patch panel with two T1 circuits for temporary communication until the final network was completed.
The crew performing a host-end communications swing (location move) at 1 AM. The move included upgrades such as increased network capacity.
Almost in the final stage of the host-end construction.

Beginning a host-end phase with cable management.